Free quotesReply within one business dayServing OR · WA · CA, shipping nationwide

Mon–Fri 8am–5pm PTTalk to our team: 971-337-6608

Get a quote

Lenokers/Services/Racking Services/Installation & Tear-Down

Racking installed right, and ready when you need it

Pallet rack installation and removal across Oregon, Washington, California and beyond. New or used racking, built to the drawing, anchored and ready to load.

✓

Reply within one business day

✓

Installation quotes are free

✓

Portland-based, serving OR, WA, CA and beyond

G

4.9★★★★★

15 Google reviews ↗

Get your install quote

We reply within one business day.

20+

years installing racking

1,200+

racking installations completed

OR · WA · CA

our core service area, with projects beyond it

★ 4.9

Google rating from 15 reviews

Sturgeon logo Lennox logo Trilogy MedWaste logo Evergreen Pet Supply logo

Photos from our jobs

Install quote

Free

First reply

Within 1 business day

Old racking

Removed or bought

“We were looking to liquidate a good amount of pallet racking from our warehouse and between our first contact and our warehouse being cleared of our racking, barely a week had passed!”

Joseph Taormina, Google review

Get my install quote

Free quote · reply within one business day

What a finished install includes

01

Built to your drawing

Frames plumb, beams level, every bay where the layout puts it.

Long run of installed pallet racking, plumb and level, loaded with stock
02

Anchored to the floor

Every frame bolted down to the seismic rules where you are.

Installer drilling a floor anchor at the base plate of a new pallet rack frame
03

Every beam locked in

Safety locks in every beam connector, so nothing lifts out.

Pallet rack beam connectors with safety locks engaged on an upright
04

Ready to load

Load signs up, packaging gone, aisles clear before we leave.

Clean warehouse aisle along finished pallet racking, ready to load

How it works

Day 1

Send your rack list

Your part: the drawing or rack list, the building and your date.

Within one business day

Free quote and a date

We check the details, price the job and book the crew.

On site

Installed aisle by aisle

We mark the floor, stand frames, set beams and anchor as we go.

Last day

Walk-through and sign-off

You check every bay with us; load signs up, site clean.

Your total effort: one rack list, one walk-through.

Installed to code, anchored and signed off

Newly installed pallet racking aisles with wire decking, labeled frames and yellow column guards in a large warehouse
✓

Plumb, level, to the drawing

Frames and beams set to the manufacturer’s tolerances.

✓

Seismic anchoring

Anchors sized and set to the seismic rules where you are.

✓

Load signs posted

The capacity of every bay, where your drivers can see it.

✓

Racking permit handled

We prepare the drawings and deal with the city and fire marshal.

Will it work for us?

01

New racking is on its way

New or used: installed and ready before you need it.

Flatbed truck delivering pallet rack frames and beams, strapped down
02

You’re changing the layout

We take it down and reinstall it to the new warehouse layout design.

Pallet rack frames and beams going up inside an operating warehouse during a reconfiguration
03

The racking has to come out

Lease end or a site closing: we dismantle it, haul it off, and can buy it.

Dismantled pallet rack beams stacked and strapped for haul-away

Explore services

Our services

All services

Coming soon

Equipment & Material Handling

Forklift, parts and equipment services are on their way. Need one now? We’ll still quote it.

Forklift Service & Repair Soon
Equipment Parts & Service Soon
Equipment Leasing & Rental Soon
Request a quote →

Google reviews

Lenokers.com 4.9 / 5 17 Google reviews
View all reviews on Google

Pallet rack installation FAQ

Ask your question

or call 971-337-6608

How much does pallet rack installation cost?

It depends on how many bays and levels you have, the racking height, the anchors your floor and seismic zone need, and how easy the site is to work in. Send your rack list or drawing and we’ll price it for free. You get one quote covering the whole job.

How long does an installation take?

It depends on the size of the job. We agree the dates with you when you approve the quote, and we install aisle by aisle, so finished aisles can be loaded while the crew moves on.

Can my own staff install pallet racking?

They can, but the racking only holds its rated load when it’s built to the drawing, plumb, anchored and locked. Most permits and insurers expect that. A trained crew does it faster, and we handle the permit too.

Do I need a permit to install racking?

Often, yes, especially for tall racking or high-piled storage. We prepare the permit drawings and deal with the city and fire marshal for you.

Will you anchor the racking to the floor?

Yes. Anchoring is part of every installation, set to the seismic rules where your building is.

Can you install while we keep operating?

Yes. We work aisle by aisle and agree the order with you, so the rest of the warehouse keeps running.

Can you take down and buy our old racking?

Yes. We dismantle it, haul it off, and can buy it from you, whether it’s still standing or already down.

Do you install used racking?

Yes. Used racking goes up to the same standard as new: built to the drawing, plumb, anchored and locked, with load signs posted.

Send your rack list. Get a free install quote.

Send what you have: a drawing, a rack list or photos of the racking. We take it from there.

Installation quote at no cost

Built to the drawing, anchored and signed off

Old racking taken down, hauled off or bought

Prefer to talk? Call 971-337-6608 · Mon–Fri 8am–5pm

Get your install quote

We reply within one business day.

Pallet rack installation in Oregon, Washington, California and beyond

Lenokers handles pallet rack installation as part of our pallet racking services, for warehouses across Oregon, Washington, California and beyond, from our base in Portland. New or used, bought from us or brought by you, racking only does its job when it goes up the way it was designed: built to the drawing, plumb and level, anchored, with every beam locked and every bay’s capacity posted. That is the standard our installers work to on every job.

What a proper installation includes

Layout marked on the floor from the approved drawing, so every frame lands where the plan and the permit say.
Frames plumb and level, shimmed where the floor isn’t flat, so the load goes straight down the uprights.
Beams at the drawn elevations, each with its safety lock engaged.
Anchors in every base plate, sized for the floor and the seismic zone.
Wire decking on every level, with row spacers and accessories as specified.
Load signs showing each bay’s rated capacity, and a final walk-through before you load.

In the US, pallet racking is designed and installed to ANSI MH16.1, the RMI standard. Building and fire codes add rules on anchoring, high-piled storage and sprinkler clearance, which is why the installation and the permit drawings have to match.

Choosing a pallet rack installer

Ask every pallet rack installer the same questions: who will be on site, whether they anchor and post load signs as part of the job, who handles the racking permit, and who you call if something isn’t right. At Lenokers, the installation, the permit and the follow-up stay with one team that has installed racking for more than 20 years.

Pallet rack removal and dismantling

Taking racking out is installation in reverse, and it needs the same care. Beams come down level by level, frames are lowered rather than tipped, and anchors are cut flush so nobody trips on them later. The parts are sorted and banded for transport and hauled away, and we can buy racking that’s still sound. If you’re moving to a new building, our warehouse relocation services take it from teardown to reinstall.

Installing used racking

Used racking is a smart way to save, as long as every part is checked before it goes up: bent or twisted uprights, cracked welds, damaged beam connectors and missing safety locks. Damaged parts are replaced, not reused, and the racking then goes up to the same standard as new: built to the drawing, plumb, anchored and posted with its capacity.

What pallet rack installation costs

Installation is priced from the job, not from a rate card. These are what drive the price:
Number of bays and levels: more pieces to stand, set and lock.
Racking height: taller frames need lifts and more time per bay.
Floor and seismic zone: the anchor type and count.
Access and schedule: working around live operations and phasing.
Old racking: taking it down and hauling it, or a buyback credit.
Send your rack list or drawing and you’ll get one free quote for the whole job.