SpeedCell High-Density Storage
Warehouse Creation Systems

SpeedCell High-Density Storage

Increase storage density by up to 60 %
Cut travel and picking times by 40 % or more
Improve order accuracy and ergonomics
Reduce unused vertical space
Lower operating and energy costs
Flexible and reconfigurable for seasonal SKUs or rapid-change inventory
Price:
From $1 850 per bay (typical setup includes rack frame, columns, and installation hardware)
Purpose

Lenokers SpeedCell High-Density Storage is designed to help warehouses, distributors, and manufacturers maximize cubic storage and SKU visibility. Perfect for light- to medium-duty inventory, it optimizes order picking, improves workflow, and reduces wasted travel in fulfillment operations.

speedcell high density storage
warehouse storage system
dynamic storage
warehouse optimization
SKU storage
Specifications
Structure Type:
Hanging cell system for pallet racks
Cell Capacity:
Up to 35 lbs per cell / 240 lbs per column / 2 400 lbs per bay
Material:
High-tenacity industrial fabric with steel reinforcement
Configuration:
3 – 16 columns per bay, multiple depths available
Mounting System:
Steel rails with bolted hangers
Installation:
Fits new or existing pallet rack structures
Applications:
Warehousing, distribution, retail, manufacturing
Description

Lenokers SpeedCell High-Density Storage systems transform standard pallet rack bays into efficient, flexible storage solutions. By converting vertical space into organized hanging cell structures, SpeedCell dramatically increases SKU capacity, picking efficiency, and warehouse visibility — all while reducing travel time and wasted motion.

Contact us
Monday – Friday 8:00am – 5pm
Saturday, Sunday – Closed
Latest cases
10.2025
Warehouse Storage for Trilogy MedWaste
08.2025
Warehouse Storage for Photon Marine
FAQ

Yes, SpeedCell is compatible with most standard selective or teardrop-style pallet racks.

SpeedCell is best for light and medium loads. For heavy pallets, see Lenokers Pallet Track systems.

Yes, components are rated for cold environments down to -20 °C / -4 °F.

Terms of delivery
Price

The price depends on the volume and your technical task

Time

Production 3-5 weeks
Delivery up to 7 days
Installation 1-5 days

Payment

When ordering up to $3,000, a 100% prepayment is required
For orders over $3,000, a 50% down payment is required, the remaining 50% before shipment
Payment is made in any convenient way for you

Manufacturer

All products are made in the USA

You viewed
Other products
Request a quote

Thank you for request!

The manager will contact you soon!

Monday – Friday 8:00am – 5pm
Saturday, Sunday – Closed